Unified School District 102 Cimarron-Ensign
School Bond Issue Information

Floor Plan  |  Financial Info  |  Brochure

 

USD 102 Patrons, Family & Friends,
     It is a great time to be a part of the Cimarron & Ensign communities. The weighted enrollment of our district has increased 10 of the last 11 years including 6 years in a row. This growth has been an issue the USD 102 Board Of Education has discussed for 2 years. In October of 2008 the Kansas Association of School Boards (KASB) was hired to conduct a survey of the number of first grade students in our future classes. The first “group” is this year’s Kindergarten group and KASB was very accurate with their estimate.  The report shows an increase of several students over the next 3-4 years.  With this information and the continued use of the double classroom modular building, the Board OF Education has adopted a $5.3 Million proposed addition to be placed on a ballot. The addition would add 10 regular sized classrooms, 1 smaller classroom and it would separate the cafeteria & PE classroom. This addition would allow USD 102 to have Pre-School services, All Day Kindergarten (if it is fully funded by the State), and additional sections of each grade 1st through 6th grade.
     The bond for the High School building will end in 2014 which makes this an opportune time to go to the public with this proposal. The $5.3 Million addition would be a minimal increase in property taxes, due to the high school bond ending. With the increase in student numbers, all-time low interest rates, and the high school bond ending, this is an excellent time for the Board Of Education to consider this plan and have the patrons of USD 102 vote on this important issue.
     Thank you for your continued and unwavering support of the schools in USD 102.

Michael S. Waters
Superintendent, USD 102